450-971-5995 info@steltec.ca

OUR ACHIEVEMENTS

As you can see, we are proud of our achievements and very pleased with the satisfaction of our customers. We invite you to discover some of our achievements and see the expertise of our company, passion for our work and the versatility of our team.

Cornell NYC Tech – Stair #5

Roosevelt Island, New York, USA

  • Number of parts : 200
  • Tonnage : 100
  • Manufacturer : Beauce Atlas
  • Description : The heart of this new academic building of Cornell University.

Bradley Air National Guard Base

East Granby, Connecticut, USA

  • Number of parts : 1700
  • Tonnage : 460
  • Manufacturer : Canatal
  • Description : A new aircraft hangar.

Grand-Heron Bridge

St-Jerome, Quebec, Canada

  • Number of parts : 150
  • Tonnage : 460
  • Manufacturer : Beauce Atlas
  • Description : A new roadway Bridge over the Highway 15.

New England Conservatory of Music

Boston, Massachusetts, USA

  • Number of parts : 2000
  • Tonnage : 850
  • Manufacturer : Beauce Atlas
  • Description : A new Student life and performance center.

Tower D

Edmonton, Alberta, Canada

  • Number of parts : Approx. 14000
  • Tonnage : Approx. 4300
  • Manufacturer : Les Constructions Beauce Atlas
  • Description : A new 28 storey office tower Located in the heart of Edmonton.

John Deere FMP building 19

Waterloo, Iowa, USA

  • Number of parts : 800
  • Tonnage : 90
  • Manufacturer : TSF Structures
  • Description : A new extension for a test cell.

Sarah Mildred Long Bridge

Kittery, Maine and Portsmouth, New Hampshire, USA

  • Number of parts : 6030
  • Tonnage : 2300
  • Manufacturer : Cianbro
  • Description : The new Sarah Mildred Long bridge replaces a 65 year old bridge that serves an estimated 14,000 drivers daily. The dual level bridge carries vehicle traffic on the top deck and railroad access to the Portsmouth Naval Shipyard on the lower deck. The main span lift superstructure is designed to carry traffic when set at the top deck level and lowers to carry trains when lowered to the railroad deck level. The main span also lifts to allow large ship access.

Hadley Falls Station

Holyoke, Massachusetts, USA

  • Number of parts : Approx. 2500
  • Tonnage : 275
  • Manufacturer : Cianbro
  • Description : This rehabilitation project was on a 1950's dam and was divided into several different parts. A new deck with his removable trash rack, A pier extension with his new bulkhead, A new fish exit flume extension and finally the new low and mid bypass conduits with his vertically removable section.